Pump Station 10

Pump Station 10

Estimated the current sewer demand based on the current land use. Analyzed the entire sewer system network associated with the pump station no. 10 using the SewerCAD software to identify if the sewer systems downstream the proposed pump station no. 10 have adequate capacity to handle the new demand. Prepared construction plans, obtained construction permits. […]